Please ensure Javascript is enabled for purposes of website accessibility 104th Avenue Corridor Improvements | JR Engineering | Colorado
top of page
a8ff26704b5b324d96429c832e142715.jpg

104th Avenue Corridor Improvements 

104th Ave Corridor Improvements Commerce City, CO

Screenshot_36.png

JR Engineering is currently serving as the Program Manager responsible for the design and construction oversight of approximately $80 million in Infrastructure for the 104th Avenue Corridor Project from Brighton Road to E-470 in Commerce City, Colorado.  The project is a multi-phased project with Local and Federal funding and includes the following major elements: 8 miles of Concrete Arterial Roadway design and construction including 7 bridge structures, Right-of-Way and Easement Acquisition in accordance with the Uniform Real Estate Act for approximately 80 property owners, 8 miles of non-potable and potable transmission and distribution lines, wastewater facilities, drainage conveyance systems, water quality ponds, railroad crossing improvements, intersection reconstruction, 10 traffic signals, streetlights, landscaping, RTD Bus stops, pedestrian underpasses, sidewalks, dry utility relocation, and electrical undergrounding.  JR Engineering is currently providing construction management, inspection, and materials testing services for Phases 3A (US 85 and 104th Avenue intersection) and 3B (104th from US 85, over I-76, to SH 2) involving CDOT oversight.  This project is a multi-jurisdictional project including coordination with Commerce City, Adams County, E-470, CDOT, FRICO, RTD, DRCOG, FHWA, UPRR, BNSF railroad, Urban Drainage, and over 80 various property, business, and HOA’s.  The project also included a public outreach and involvement program to keep the public involved throughout the project duration.

bottom of page