Please ensure Javascript is enabled for purposes of website accessibility
top of page
High Line Canal Operational Hydroloic Modeling Update.jpg

WATER RESOURCES

Reunion Village 9 - Ragweed Draw Enhanced.jpg
Reunion Village 9 Ragweed Draw

Learn More

Vineland Area Outfall Systems.png
Vineland Area Outfall Systems Plan - Phase A

Learn More

Sand Creek Channel.png
Sand Creek Channel Restoration

Learn More

DJI_0107_edited.jpg
O Street & 59th Avenue Waterline

Learn More

Vail Stormwater Master Plan.png
Vail Stormwater Master Plan

Learn More

ChatGPT Image Sep 23, 2026, 03_11_17 PM.png
South Outfall Phase II Culvert Project

Learn More

Las Vegas Street Drop Structure.png
Las Vegas Street Drop Structure

Learn More

Lutz Reservoir Pump Station.png
Lutz Reservoir Non-Potable Pump Station

Learn More

High Line Canal Operational Hydrologic Modeling_2.jpg
High Line Canal Operational Hydrologic...

Learn More

Sable Boulevard Regional Outfall.png
Sable Boulevard Regional Outfall

Learn More

Brighton Core City Phase 3 Waterline.png
Brighton Core City Phase 3 Waterline...

Learn More

4525a7a6-ea6e-4673-884e-8782673946d0.png
Centennial/Dominion Emergency Interconnect

Learn More

Additional Projects

Storm Drainage Conveyance Design

  • Colorado Centre Drainage Improvement - El Paso County

  • Bridge Street Widening Project 27th Ave to Telluride Street Drainage Design - Brighton

  • Bryant Drive Storm Drain Improvements Project - Federal Heights

  • Solstice Offsite Drainage Outfall - Douglas County/USACE

  • 104th Avenue Regional Water Quality/Detention Pond Conversion – Commerce City

  • Reunion Filing 34 Storm Drainage and Water Quality/Detention – Commerce City

  • Eagle River Street Storm Sewer and Detention Ponds – Douglas County

  • Crystal Valley Parkway Drainage Analysis and Storm Sewer Design – Castle Rock

  • Denver International Business Center Filing No. 5 and 7 Drainage Analysis and Storm Sewer Design– Denver

  • Peña Station Filing No. 1 and 2 Drainage Analysis and Storm Sewer Design - Denver

Drainage Master Planning

Stream Stabilization/Restoration

  • Sand Creek Stream Restoration - El Paso County

  • Fairgrounds Tributary and South Platte River South Tributary 6 Stream Restoration – Thornton

  • Second Creek Reach 3 Stream Restoration - Commerce City 

  • Dogwood Gulch Channel Improvements – Denver

  • Blue Grama Channel & Water Quality Ponds - Denver

  • Ragweed Draw Channel Improvements – Commerce City

Water Systems Planning & Transmission and Distribution System Design

  • Brighton Core Water Line - Brighton

  • Lutz Reservoir Pump Station Transmission Main – Brighton

  • CWSD/DWSD Emergency Interconnect - Highlands Ranch Water 

  • Chesapeake Pipeline Replacement Project – Highlands Ranch Water

  • Swan Meadow Village Water Line Replacement - Dillon

Pump Stations and Sanitary Sewer Lift Station Design

  • Lutz Reservoir Irrigation Pump Station - Brighton

  • Frisco Bay Marina Stormwater Pump Station – Frisco

  • 61st and Pena Lift Station - Denver

  • Meridian Lift Station H - Douglas County

  • Reunion Irrigation Conversion and Booster Pumps - Commerce City 

Irrigation Canal Improvements

  • Bull Canal Realignment at 152nd Avenue and Washington Street - Thornton/FRICO

  • O'Brian Canal Crossing at 104th Avenue - Commerce City/FRICO

  • Little Burlington Canal Crossing at 104th Avenue – Commerce City/FRICO

  • Fulton Ditch Realignment - Brighton/Fulton Ditch Company 

  • Brighton Lateral 144th Avenue Crossing – Brightoon/FRICO

Sanitary Sewer Planning and Design

  • Metro Water Recovery Interceptor Connection Riverfront Subdivision - Brighton

  • Crystal Valley Ranch Sanitary Sewer Outfall - Castle Rock

  • Timberleaf Subdivision Sanitary Sewer – Thornton

  • 61st & Peña Station Development Wastewater Master Planning - Denver 

  • Reunion Phase 3A Sanitary Sewer Interceptor – Commerce City

Floodplain Analyses and Map Revisions

  • Sand Creek at Sterling Ranch CLOMR - El Paso County

  • Sand Creek Center Tributary LOMR – El Paso County

  • Tanglewood Creek CLOMR and LOMR - Westminster

  • Washington Street - Mustang Ryn No-Rise - Thornton 

  • Murphy Creek Trail Improvements No-Rise Analysis – Aurora

bottom of page